Yaskawa SRDA-SDA71A01A-E Original Industrial Spare NX100 Compatible
SRDA-SDA71A01A-EOriginal Yaskawa SRDA-SDA71A01A-E NX100 CPU control board. Drop-in replacement for JZRCR-NPP01B-1 & JANCD-NCP01-1. 12-month warranty. Fast worldwide shipping.
Request availability, condition, lead time and export shipping details for JZRCR-NTU01D-1.
Send this exact part number, quantity and destination country. TOPNLMS will confirm availability, condition and export lead time before quotation.
When your Yaskawa NX100 robot controller experiences a power supply failure or when the JZRCR-NTU01D-1 unit reaches end-of-service life, unplanned downtime can cascade across your entire production line. TOPNLMS supplies verified, ready-to-ship JZRCR-NTU01D-1 power supply units specifically sourced for NX100 controller retrofit and emergency replacement projects. Our stock is pre-tested, fully documented, and backed by a 12-month warranty — giving procurement and maintenance teams the confidence to act fast without compromising system integrity.
The JZRCR-NTU01D-1 is the dedicated internal power supply unit for the Yaskawa NX100 robot controller platform, widely deployed in arc welding, material handling, and assembly automation cells. As Yaskawa has progressively transitioned its controller ecosystem toward the DX100 and YRC1000 platforms, many facilities running NX100-based systems face the challenge of sourcing reliable spare parts for ongoing maintenance or planning a phased migration. This unit directly powers the NX100 controller’s CPU board, I/O interface boards, and servo amplifier communication circuits — making it a critical component whose failure immediately halts robot operation.
For facilities performing a like-for-like replacement, the JZRCR-NTU01D-1 installs directly into the existing NX100 controller cabinet without any wiring modification. The connector pinout, mounting rail dimensions, and DC output rails (typically +5V, +12V, +24V) are identical to the original specification, ensuring that the JZRCR-YSF21 servo amplifier boards, JZRCR-NTU02 I/O interface units, and the JZNC-NRK01B CPU module continue to operate without reprogramming or parameter changes. Maintenance teams can complete the swap during a scheduled maintenance window with standard tools.
For sites planning a broader NX100-to-DX100 migration, the JZRCR-NTU01D-1 serves as a bridge solution — keeping existing robots operational while the migration is staged across multiple cells. During this transition period, the NX100 controller’s DeviceNet and Ethernet/IP communication modules remain fully functional, preserving upstream PLC connectivity to Yaskawa MP2300 machine controllers or third-party Siemens S7-300 PLCs managing the production cell. Replacing the PSU rather than the entire controller avoids the need to re-teach robot programs, re-map I/O assignments, or reconfigure teach pendant settings — a significant saving in engineering hours.
Physical installation is straightforward: the JZRCR-NTU01D-1 occupies a fixed slot within the NX100 controller cabinet’s power section. Cabinet depth, DIN rail spacing, and AC input wiring (single-phase 200–240VAC) are unchanged from the original configuration. There is no need to modify the cabinet door, cable management channels, or the JZRCR-NTU03 battery backup unit mounted adjacent to the PSU. For sites where the controller cabinet also houses a JZRCR-YSF21 servo amplifier or an external JZNC-NIF01B network interface board, these components are unaffected by the PSU replacement and continue to communicate normally over the NX100 internal backplane bus.
TOPNLMS maintains buffer stock of the JZRCR-NTU01D-1 specifically to support emergency replacement scenarios. Each unit undergoes functional load testing prior to dispatch, verifying output voltage stability under rated load conditions. Units are shipped with original-equivalent packaging, ESD protection, and a full inspection report. Standard lead time from order confirmation to dispatch is 1–3 business days from our Xiamen warehouse, with DHL Express, FedEx International Priority, and sea freight options available depending on urgency and destination.
| Parameter | Original: JZRCR-NTU01D-1 | Replacement: JZRCR-NTU01D-1 (TOPNLMS) |
|---|---|---|
| Compatible Controller | Yaskawa NX100 | Yaskawa NX100 (direct fit) |
| Input Voltage | Single-phase 200–240VAC, 50/60Hz | Identical specification |
| DC Output Rails | +5V, +12V, +24V | Identical output rails |
| Connector / Pinout | OEM NX100 internal connector | OEM-equivalent, no wiring change |
| Mounting | Fixed slot, NX100 cabinet power section | Direct drop-in, no bracket modification |
| Communication Impact | N/A (PSU replacement) | Zero — DeviceNet, Ethernet/IP unaffected |
| Program Retention | N/A | No re-teaching required |
| Replacement Recommendation | Like-for-like or bridge during DX100 migration | Recommended for both scenarios |
| Warranty | OEM (expired / EOL) | 12-Month TOPNLMS Warranty |
| Lead Time | — | 1–3 business days, Xiamen dispatch |
A successful NX100 power supply replacement or migration project rarely involves a single component. In practice, maintenance engineers sourcing the JZRCR-NTU01D-1 often simultaneously evaluate the condition of adjacent components within the same controller cabinet. The JZRCR-YSF21 servo amplifier board, which interfaces directly with the PSU’s +24V rail, is a common co-replacement item — particularly in systems with high operating hours where capacitor aging affects both units simultaneously. Similarly, the JZNC-NRK01B CPU module and JZRCR-NTU02 I/O interface board should be inspected during any PSU swap, as voltage irregularities from a failing PSU can stress these boards over time.
For sites running NX100 controllers in multi-robot cells coordinated by a Yaskawa MP2300 machine controller, the PSU replacement is an opportunity to audit the JZNC-NIF01B network interface board and verify that Ethernet/IP or DeviceNet communication parameters are correctly retained after power cycling. In cells where the NX100 communicates upstream with a Siemens S7-300 or Allen-Bradley ControlLogix PLC via a gateway module, confirming communication recovery after PSU replacement is a standard commissioning step that should be documented in the site’s maintenance log.
Facilities planning a longer-term migration from NX100 to DX100 or YRC1000 will also need to consider the JZRCR-NTU03 battery backup unit, teach pendant cable assemblies, and the DX100 JANCD-MCP01 CPU board as part of the broader upgrade bill of materials. TOPNLMS can supply these components alongside the JZRCR-NTU01D-1, allowing procurement teams to consolidate orders and reduce freight costs. All components are sourced, tested, and dispatched from our Xiamen facility under the same 12-month warranty terms.
Q: Does replacing the JZRCR-NTU01D-1 require any wiring changes inside the NX100 cabinet?
A: No. The replacement unit uses the same connector pinout and mounting position as the original. Disconnect AC input, unplug DC output connectors, remove the four mounting screws, and reverse the process with the new unit. Total swap time is typically under 30 minutes for a trained technician.
Q: Will robot programs and I/O mappings be lost during the PSU replacement?
A: Robot programs are stored on the JZNC-NRK01B CPU module’s flash memory and are not affected by PSU removal. I/O mappings, system parameters, and tool calibration data are retained. A full system backup via the teach pendant is recommended before any maintenance procedure as standard practice.
Q: Is the JZRCR-NTU01D-1 compatible with all NX100 controller variants?
A: The JZRCR-NTU01D-1 is the standard PSU for the NX100 platform across arc welding (NX100-AW), handling (NX100-HW), and spot welding (NX100-SW) variants. If your controller uses a different PSU suffix (e.g., NTU01B or NTU01C), please contact us to confirm compatibility before ordering.
Q: Can this PSU be used as a bridge while we migrate to DX100?
A: Yes. Many facilities use a verified JZRCR-NTU01D-1 replacement to extend NX100 operational life by 12–24 months while the DX100 migration is planned and budgeted. This avoids emergency controller replacement costs and allows a controlled, scheduled transition.
Q: What communication protocols are supported after replacement?
A: The PSU replacement has no effect on communication protocols. DeviceNet, Ethernet/IP, and RS-232 interfaces on the NX100 controller resume normal operation immediately after power-on. No gateway reconfiguration is required.
Q: What if the replacement unit does not resolve the fault?
A: TOPNLMS provides a 12-month warranty with return and replacement support. If the fault persists after PSU replacement, our technical team will assist in diagnosing whether the issue lies with the JZRCR-YSF21 servo amplifier board or the JZNC-NRK01B CPU module.
Every JZRCR-NTU01D-1 unit supplied by TOPNLMS is covered by a 12-month warranty from the date of dispatch. Our pre-shipment process includes functional load testing under rated input voltage, output voltage verification across all DC rails, visual inspection for component damage, and ESD-safe packaging. Each unit ships with a test report and batch traceability record.
In the event of a warranty claim, TOPNLMS provides a replacement unit dispatch within 3 business days of fault confirmation — minimizing secondary downtime. Our after-sales team is reachable via email and phone for technical support throughout the warranty period. We do not require the original unit to be returned before dispatching a replacement in urgent production-down scenarios, subject to prior agreement.
For procurement teams requiring documentation, we can provide a Certificate of Conformance, packing list, and commercial invoice in formats compatible with standard ERP receiving workflows. Volume orders (5+ units) qualify for priority allocation from our buffer stock and dedicated account management.
Click Quote This Model and the Part Number field will auto-fill with JZRCR-NTU01D-1.