GE DS200TCOBG1AEB Replacement Solution for Mark VI
DS200TCOBG1AEBGE DS200TCOBG1AEB Mark VI turbine main control board replacement. Compatible upgrade, 12-month warranty, fast shipping. Drop-in retrofit for legacy GE systems.
Request availability, condition, lead time and export shipping details for DS200SSBAG1BAA.
Send this exact part number, quantity and destination country. TOPNLMS will confirm availability, condition and export lead time before quotation.
The GE DS200SSBAG1BAA is a critical Sequence of Events (SOE) and Static Switch Board used within the GE Mark V Speedtronic turbine control system — one of the most widely deployed gas and steam turbine control platforms in power generation, oil & gas, and petrochemical industries. As GE has progressively discontinued Mark V hardware, operators face increasing pressure to source reliable, tested replacement boards that maintain full backward compatibility with existing Mark V panel wiring, I/O assignments, and inter-board communication protocols.
This DS200SSBAG1BAA replacement unit is sourced, inspected, and dispatched from our Xiamen warehouse. It is designed as a direct drop-in substitute for the original GE part, preserving the same board-edge connector pinout, the same VME-style backplane interface, and the same firmware-level handshake behavior expected by the Mark V , and
| Parameter | Original DS200SSBAG1BAA | This Replacement Unit |
|---|---|---|
| Part Number | DS200SSBAG1BAA | DS200SSBAG1BAA (equivalent) |
| Compatible System | GE Mark V Speedtronic | GE Mark V Speedtronic |
| Board Function | Sequence of Events / Static Switch | Sequence of Events / Static Switch |
| Backplane Interface | VME-style Mark V backplane | VME-style Mark V backplane (direct fit) |
| Communication Protocol | IONET / ARCNET | IONET / ARCNET compatible |
| Connector Pinout | OEM standard | Identical — no rewiring required |
| Power Supply Requirement | +5 VDC / ±15 VDC via backplane | Same — supplied via Mark V rack PSU |
| Physical Dimensions | Standard Mark V card form factor | Identical form factor — no panel modification |
| Replacement Scope | OEM (discontinued) | Direct replacement / upgrade solution |
| Warranty | OEM warranty expired | 12-Month Warranty from TOPNLMS |
A successful DS200SSBAG1BAA replacement rarely occurs in isolation. In most Mark V panel retrofits, engineers simultaneously address adjacent boards and subsystems to ensure the entire control architecture is restored to a reliable operating state. The DS200DCFBG1BDB DC/DC power converter board, which supplies regulated voltages to the SOE and static switch circuitry, is frequently replaced alongside the DS200SSBAG1BAA when the root cause of failure is traced to power rail instability. Similarly, the DS200SDCCG1AFB speed detector and contact closure board shares the same Mark V backplane slot region and is often inspected or swapped during the same maintenance window.
For sites running the full Mark V triplex configuration, the DS200TCQAG1BHF turbine control board and the DS200TCRAG1AAA relay output board are integral to the ,
On the I/O side, the DS200DSPCH1A digital signal processor board and the DS200ADGIH1A analog-to-digital input board are common co-replacement items when a Mark V panel is being comprehensively refurbished rather than spot-repaired. For sites that have already migrated their HMI from the original GE Cimplicity workstation to a modern SCADA interface, ensuring that the replacement DS200SSBAG1BAA correctly re-establishes its SOE timestamp synchronization with the updated HMI communication gateway is a critical commissioning step. The GE Mark V programming cable (typically a serial RS-232 to Mark V diagnostic port adapter) is an essential tool for post-installation verification and should be on-site before the board swap begins.
Finally, for plants considering a phased migration toward the GE Mark VIe platform, the DS200SSBAG1BAA replacement can serve as a bridge solution — maintaining turbine availability while the broader Mark VIe migration project is planned and budgeted. The Mark VIe I/O terminal boards and the IS420ESWAH1A Ethernet switch module are typical first-phase additions in such hybrid architectures.
Q: Do I need to re-terminate field wiring when installing this replacement board?
No. The DS200SSBAG1BAA replacement uses the identical board-edge connector and backplane pinout as the original GE part. Field wiring connected to the Mark V terminal boards remains undisturbed. Only the board itself is swapped.
Q: Is the IONET/ARCNET communication automatically re-established after installation?
In most cases, yes. The Mark V core processors will re-detect the board on the IONET bus during the next power-up sequence. If the system was previously configured with a fixed node address for the SOE board, verify that the replacement board’s DIP switch or jumper settings match the original configuration before powering up.
Q: Will my existing Mark V application program (PROM or flash) need to be reloaded?
The application logic resides in the ,
Q: What are the physical space requirements for installation?
The replacement board occupies the same single-slot Mark V card cage position as the original. No panel modification, DIN rail adjustment, or cabinet re-layout is required. Ensure the card cage slot is de-energized and the Mark V panel is in a safe maintenance state before insertion.
Q: Can this board be used in both gas turbine and steam turbine Mark V applications?
Yes. The DS200SSBAG1BAA is a platform-level board used across GE’s Mark V installations for both gas turbine (Frame 5, Frame 6, Frame 7, Frame 9) and steam turbine applications. Compatibility is determined by the Mark V panel revision and backplane configuration, not by the turbine type.
Q: What commissioning steps are recommended after installation?
After physical installation, power up the Mark V panel and observe the board’s LED status indicators. Use the Mark V diagnostic toolbox to verify SOE timestamp synchronization, static switch output status, and IONET communication health. Perform a controlled trip test if plant safety procedures permit, to confirm the static switch outputs respond correctly to the ,
Every DS200SSBAG1BAA replacement unit shipped by TOPNLMS is covered by a 12-Month Warranty from the date of delivery. Prior to dispatch, each board undergoes a multi-point outgoing inspection that includes visual examination for component damage, power rail continuity testing, and functional verification of key interface signals. Units that do not pass inspection are quarantined and never shipped.
In the event of a warranty claim, TOPNLMS provides a replacement unit or full refund, subject to inspection of the returned board. Our after-sales response target is 24 hours for initial acknowledgment and 72 hours for resolution proposal. Replacement units for warranty claims are dispatched from our Xiamen inventory with priority shipping to minimize your plant downtime.
For procurement teams requiring documentation, we can provide an outgoing inspection report, packing list, and commercial invoice with HS code declaration upon request. All units are shipped with ESD-protective packaging and double-boxed for international freight.
To place an order, request a quotation, or discuss bulk procurement for MRO inventory programs, contact our technical sales team directly.
Click Quote This Model and the Part Number field will auto-fill with DS200SSBAG1BAA.