Applied Materials US22203-0190-13031-8STN Replacement for Centura
US22203-0190-13031-8STNDrop-in replacement for Applied Materials US22203-0190-13031-8STN pneumatic slit valve. Centura/Endura compatible. 12-month warranty. Fast global shipping.
Request availability, condition, lead time and export shipping details for 3200-00004.
Send this exact part number, quantity and destination country. TOPNLMS will confirm availability, condition and export lead time before quotation.
In semiconductor fabrication and advanced thin-film processing environments, unplanned downtime caused by a failed gas delivery module can cascade into hours of lost wafer throughput, process drift, and costly chamber re-qualification. The Applied Materials 3200-00004 Process Gas Delivery Module is a critical original spare component designed for CVD (Chemical Vapor Deposition) and Etch process chambers, ensuring precise, contamination-free gas flow control across the full process cycle. Sourcing a verified original replacement unit — rather than a field-fabricated workaround — is the single most effective action a maintenance team can take to restore chamber integrity and resume production with confidence.
At TOPNLMS, every 3200-00004 unit is inspected, function-verified, and shipped with a 12-month warranty, giving procurement and maintenance engineers a reliable, documented spare that satisfies both operational and audit requirements. Whether you are managing a scheduled PM cycle, responding to an unplanned chamber fault, or building a strategic spare parts buffer for aging AMAT platforms, this module delivers the original-spec performance your process demands.
| Parameter | Specification |
|---|---|
| Part Number / SKU | 3200-00004 (Alt: 54011208 / 930YNC/NOS6989 / EX-C45FF-100S27) |
| Manufacturer | Applied Materials (AMAT) |
| Product Type | Process Gas Delivery Module — Semiconductor Gas Panel |
| Compatible Process | CVD (Chemical Vapor Deposition), Plasma Etch |
| System Compatibility | Applied Materials CVD / Etch Chamber Platforms |
| Origin | United States |
| Installation Type | Direct OEM Replacement — No Modification Required |
| Operating Environment | Cleanroom-compatible; semiconductor fab process environment |
| Condition | Original / Genuine OEM Spare |
| Warranty | 12 Months from Date of Shipment |
| Pre-shipment Testing | Function-verified prior to dispatch |
| Shipping | Worldwide; ESD-safe and anti-static packaging |
A gas delivery module failure rarely occurs in isolation. In a well-maintained CVD or Etch chamber, the gas panel works in close coordination with multiple upstream and downstream components. When scheduling a replacement of the 3200-00004, experienced maintenance engineers treat the event as an opportunity to inspect and — where warranted — proactively replace adjacent components that share the same service interval or failure mode.
The mass flow controllers (MFCs) that meter process gases into the panel are subject to drift and seal degradation over time; verifying calibration or replacing aging MFC units during the same downtime window eliminates a common root cause of post-maintenance process excursions. Similarly, the pneumatic valve actuators and solenoid valve assemblies integrated into the gas panel manifold should be inspected for seat wear and response-time deviation — a sluggish valve can introduce timing errors that affect film uniformity.
Downstream of the gas panel, the process chamber liner and showerhead assembly accumulate deposition byproducts that can contaminate a freshly installed gas module if not cleaned or replaced concurrently. Maintenance teams should also verify the integrity of the VCR fittings and high-purity gas line connections at every panel interface point, as micro-leaks at these junctions are a leading cause of process gas cross-contamination and particle generation.
On the control side, the AMAT system controller I/O boards and interlock relay modules that govern gas panel sequencing should be checked for firmware currency and contact integrity. An aging relay module with marginal contact resistance can cause intermittent gas valve faults that are difficult to diagnose without a known-good spare on hand. Likewise, the pressure transducers and vacuum gauges monitoring the gas delivery lines should be re-zeroed and calibrated after any panel replacement to ensure the process recipe pressure setpoints remain accurate.
For facilities managing multiple AMAT chambers, a structured spare parts inventory that includes the 3200-00004 gas panel alongside turbomolecular pump controllers, RF match network components, and chamber temperature control modules provides the broadest protection against extended unplanned downtime. Establishing a minimum stock level of one verified spare per chamber type — reviewed quarterly — is a widely adopted best practice in high-volume semiconductor fabs and research institutions alike.
The 3200-00004 is an original Applied Materials part number, making it the preferred replacement for any CVD or Etch platform that originally shipped with this gas panel configuration. Unlike aftermarket alternatives, an original OEM module eliminates the compatibility verification burden: installation is a direct swap, process recipes require no re-tuning, and the chamber can return to production qualification faster.
For facilities operating legacy AMAT platforms where the original part number has been superseded or is no longer available through the OEM’s standard service channel, the 3200-00004 — with its documented alternate part numbers (54011208, 930YNC/NOS6989, EX-C45FF-100S27) — provides a validated cross-reference path that preserves system compatibility without requiring engineering change orders or process re-validation. This is particularly valuable for fabs extending the productive life of older CVD or Etch tools beyond the OEM’s standard support window.
Sourcing through TOPNLMS provides an additional layer of supply chain resilience: our inventory is independently inspected, and each unit ships with documented test results and a 12-month warranty that supports both internal maintenance records and external audit requirements. Lead times are confirmed at the time of order, and expedited shipping is available for critical downtime situations.
Q1: What is the warranty coverage for the Applied Materials 3200-00004?
Every unit ships with a 12-month warranty from the date of shipment. The warranty covers manufacturing defects and functional failures under normal operating conditions. Warranty claims are supported by our technical team with replacement or refund options.
Q2: How is the unit tested before shipment?
Each 3200-00004 module undergoes function verification prior to dispatch. Units are inspected for physical integrity, connector condition, and operational readiness. A test record is available upon request for quality documentation purposes.
Q3: Can this module replace units with alternate part numbers such as 54011208 or EX-C45FF-100S27?
Yes. The alternate part numbers 54011208, 930YNC/NOS6989, and EX-C45FF-100S27 are documented cross-references for the 3200-00004. If you are uncertain about compatibility with your specific chamber configuration, please contact our technical team with your chamber model and process type before ordering.
Q4: What is the recommended spare parts strategy for facilities with multiple AMAT chambers?
We recommend maintaining at least one verified spare 3200-00004 per chamber type in your on-site inventory, reviewed on a quarterly basis. For high-utilization fabs, a two-unit buffer per chamber type reduces the risk of back-to-back downtime events. Our team can assist with volume pricing and scheduled replenishment planning.