LAM RESEARCH 853-054147-001 Etch System Liquid Pump Upgrade
853-054147-001LAM RESEARCH 853-054147-001 chemical delivery liquid pump replacement for etch systems. Compatible upgrade, 12-month warranty, fast global shipping from Xiamen.
Request availability, condition, lead time and export shipping details for S2165.
Send this exact part number, quantity and destination country. TOPNLMS will confirm availability, condition and export lead time before quotation.
In semiconductor fabrication and precision industrial environments, unplanned downtime caused by a failed ring assembly can cascade into hours of lost production, costly chamber re-qualification, and delayed wafer processing schedules. The LAM RESEARCH SI 716-230577-377 (cross-reference: SI 716-230577-364) is an original S2165 series ring assembly engineered to maintain chamber integrity, process uniformity, and long-term system stability in LAM RESEARCH etch and deposition platforms. Sourcing a verified original spare — rather than an unqualified substitute — is the single most effective step a maintenance team can take to protect uptime and preserve process repeatability.
At TOPNLMS, every unit of the SI 716-230577-377 is sourced through verified industrial supply channels, inspected prior to dispatch, and backed by a 12-month warranty. Whether you are building a critical-spare inventory buffer, executing a scheduled preventive maintenance cycle, or responding to an emergency chamber-down event, this ring assembly ships promptly with full traceability documentation.
| Parameter | Specification |
|---|---|
| Part Number (Primary) | SI 716-230577-377 |
| Cross-Reference / Alternate PN | SI 716-230577-364 |
| Series | S2165 |
| Product Type | Ring Assembly |
| OEM Brand | LAM RESEARCH |
| Country of Origin | United States |
| Application Platform | LAM RESEARCH Etch / CVD / ALD Process Chambers |
| Compatibility | S2165 series chamber configurations; cross-compatible with SI 716-230577-364 installations |
| Installation Environment | Cleanroom / Semiconductor Fab / Precision Industrial |
| Maintenance Role | Chamber sealing integrity, process uniformity, consumable replacement |
| Condition | Original / New |
| Pre-shipment Inspection | Yes — dimensional and visual inspection prior to dispatch |
| Warranty | 12 Months |
| Lead Time | Contact for availability; express dispatch available for critical-down situations |
A ring assembly replacement on a LAM RESEARCH S2165 platform is rarely an isolated event. Experienced process engineers and maintenance planners treat each scheduled chamber opening as an opportunity to audit the full consumable and wear-part ecosystem. When replacing the SI 716-230577-377, the following components should be inspected — and stocked as critical spares — to avoid a return visit within the same maintenance window.
The focus ring and edge ring assemblies adjacent to the SI 716-230577-377 installation zone experience similar plasma exposure cycles and should be evaluated for erosion or dimensional drift at the same interval. The chamber liner and confinement ring are high-wear consumables that directly affect process uniformity; replacing them on a coordinated schedule with the ring assembly eliminates the risk of a secondary chamber-down event within weeks of the primary repair. The upper electrode assembly and lower electrode baffle should be inspected for deposition buildup or cracking, particularly in high-power etch recipes.
On the electrical and control side, the RF match network components — including match capacitors and RF cables — should be checked for impedance drift whenever a chamber is opened for mechanical maintenance, as mechanical vibration during disassembly can loosen RF connections. The ESC (electrostatic chuck) assembly is a critical long-lead-time item; maintaining at least one spare ESC in inventory prevents multi-week delays if chuck failure coincides with a ring assembly replacement cycle. The gas distribution plate (showerhead) should be inspected for hole plugging or corrosion, and the process kit O-rings and seals — including chamber body seals and gate valve seals — should be replaced as a set during any major chamber opening to ensure vacuum integrity after reassembly.
Finally, the temperature control unit (TCU) hoses and fittings connected to the chamber body should be inspected for micro-cracking or coolant residue, and the turbo pump inlet screen should be cleaned or replaced to prevent particulate contamination of the pumping system following chamber work. Coordinating procurement of these components alongside the SI 716-230577-377 reduces total maintenance labor hours and minimizes the risk of a repeat chamber-down event within the same quarter.
The SI 716-230577-377 is a direct OEM replacement for the SI 716-230577-364, making it a drop-in solution for facilities that have encountered the earlier part number in their legacy BOM or maintenance records. No tooling modification, re-qualification protocol change, or process recipe adjustment is required when substituting -377 for -364 in an S2165 chamber configuration — the dimensional and material specifications are maintained to OEM tolerances.
For facilities managing aging LAM RESEARCH etch platforms beyond their original service life, maintaining a stock of original OEM ring assemblies is a proven strategy for extending system longevity without the capital expenditure of a full chamber upgrade. Original parts preserve the process window established during initial tool qualification, avoiding the recipe drift and yield loss that can accompany the use of non-OEM consumables. A recommended stocking strategy for high-utilization fabs is to maintain a minimum of two units of the SI 716-230577-377 on the shelf, with a reorder trigger set at one unit remaining — this ensures a replacement is always available for both scheduled PM cycles and unplanned chamber-down events without excessive carrying cost.
TOPNLMS supports maintenance planners with flexible order quantities, competitive pricing on multi-unit purchases, and rapid dispatch for critical-down situations. All units are tested and inspected prior to shipment, and each order is accompanied by documentation supporting traceability requirements in ISO-certified and SEMI-compliant manufacturing environments.
Q1: Is the SI 716-230577-377 a direct replacement for SI 716-230577-364?
Yes. The SI 716-230577-377 is the current OEM part number and is dimensionally and materially equivalent to the SI 716-230577-364. It is a confirmed drop-in replacement with no process or tooling changes required in S2165 series chamber configurations.
Q2: What does the 12-month warranty cover?
The 12-month warranty covers manufacturing defects and dimensional non-conformance identified upon installation. Each unit undergoes pre-shipment visual and dimensional inspection. Warranty claims are supported with replacement dispatch and full documentation. Warranty period begins from the date of shipment.
Q3: How should I verify compatibility before installation?
Confirm your chamber model and S2165 series configuration against your tool BOM or OEM process kit documentation. Cross-reference the part number SI 716-230577-364 if that is the number listed in your legacy records — both numbers confirm compatibility with this unit. Contact our technical team at [email protected] if you require additional compatibility verification support.
Q4: What is the recommended inventory stocking strategy for this part?
For high-utilization fabs running S2165 platforms on 24/7 schedules, we recommend maintaining a minimum of two units on-site with a reorder trigger at one unit. For lower-utilization environments or facilities with longer acceptable downtime windows, a single on-site spare with a confirmed supplier lead time on file is a practical minimum. Multi-unit pricing is available — contact us for volume quotation.
Click Quote This Model and the Part Number field will auto-fill with S2165.