Siemens 6SL3120-1TE24-5AA3 Original S120 Motor Module
6SL3120-1TE24-5AA3Original Siemens 6SL3120-1TE24-5AA3 SINAMICS S120 Single Motor Module 45A Booksize. Genuine spare, tested, 12-month warranty. Fast global shipping from TOPNLMS.
Request availability, condition, lead time and export shipping details for 6SE7033-7EH84-1BH0.
Send this exact part number, quantity and destination country. TOPNLMS will confirm availability, condition and export lead time before quotation.
The Siemens 6SE7033-7EH84-1BH0 is a high-performance Vector Control Unit (VCU) belonging to the SIMOVERT MASTERDRIVES MC (Motion Control) series — one of Siemens’ most widely deployed drive platforms in heavy industrial, crane, winding, and precision motion applications. As this model reaches end-of-life and spare parts become increasingly scarce, plant engineers and procurement teams are actively seeking a verified replacement or upgrade path that preserves existing wiring infrastructure, control cabinet space, and PROFIBUS/USS communication architecture.
TOPNLMS maintains ready stock of the 6SE7033-7EH84-1BH0 and its compatible upgrade equivalents, sourced from authorized supply chains and subject to full functional testing prior to dispatch. Whether you are executing a like-for-like swap on a production line or planning a phased migration to a newer Siemens drive platform, our technical team supports your retrofit from initial compatibility assessment through to on-site commissioning guidance.
| Parameter | 6SE7033-7EH84-1BH0 (Original) | Replacement / Upgrade Path |
|---|---|---|
| Series | SIMOVERT MASTERDRIVES MC | MASTERDRIVES MC / SINAMICS S120 (migration) |
| Function | Vector Control Unit (VCU) | Vector / Motion Control Unit |
| Rated Current | ~370 A (frame size H) | Matched to original rating |
| Communication | PROFIBUS DP / USS | PROFIBUS DP / PROFINET (via adapter) |
| Control Interface | CBP2 / CBC board slot | Compatible slot interface retained |
| Mounting / Form Factor | Chassis unit, booksize | Same footprint; no cabinet modification required |
| Power Supply | 24 VDC auxiliary, 3-phase AC main | Identical supply requirements |
| Encoder Interface | HTL/TTL incremental encoder | HTL/TTL retained; SSI optional via SBP board |
| Installation Wiring | Existing terminal block layout | Direct terminal-to-terminal compatibility |
| Parameter Migration | DriveMonitor / STARTER | Backup via P060 parameter set; restore on new unit |
| Replacement Recommendation | Direct swap recommended; SINAMICS S120 migration available for long-term modernization | |
| Warranty | 12-Month Warranty — all units tested before shipment | |
A successful replacement of the 6SE7033-7EH84-1BH0 rarely involves the control unit alone. In most MASTERDRIVES MC installations, the VCU operates in close coordination with companion components that must be verified or replaced in parallel to ensure system stability after the swap.
The CBP2 PROFIBUS communication board (6SE7090-0XX84-0FF5) is typically mounted in the option slot of the VCU and handles all fieldbus traffic between the drive and the PLC — commonly a Siemens S7-300 or S7-400 controller. When replacing the VCU, the CBP2 should be inspected and, if showing signs of wear or firmware mismatch, replaced simultaneously to avoid intermittent PROFIBUS faults post-commissioning.
The SBP encoder evaluation board (6SE7090-0XX84-0KA0) is equally critical in motion-control applications where the 6SE7033-7EH84-1BH0 is used for closed-loop speed or position control. Verifying encoder signal integrity through the SBP board before and after the VCU swap eliminates a common source of post-replacement oscillation or speed deviation alarms.
On the power side, the 6SE7033-7EH84-1JA0 Power Module — the companion inverter unit in the same MASTERDRIVES chassis — should be inspected for DC bus capacitor condition and IGBT health. In many aging installations, the power module and control unit fail within the same maintenance window, and replacing both together reduces the risk of a second unplanned outage within months.
For sites running multiple drives on a shared DC bus, the 6SE7031 and 6SE7032 series Active Front End (AFE) rectifier units and their associated 6SE7090 series line reactors form the upstream supply infrastructure. Any replacement of a downstream VCU should be accompanied by a DC bus voltage check and a review of the AFE’s current-sharing parameters to confirm the new unit is correctly integrated into the common bus architecture.
Where the existing control cabinet uses a Siemens OP17 or OP27 HMI panel connected via MPI or PROFIBUS, the drive replacement process should include a review of the HMI’s drive parameter screen assignments. Parameter address offsets can shift between firmware versions, and a brief re-mapping session in WinCC Flexible or ProTool prevents operator interface errors after the unit is live.
Sites that rely on a Siemens S7-300 CPU 315-2 DP or CPU 317-2 DP as the master controller will find that the replacement VCU integrates without any changes to the existing STEP 7 drive function blocks (FB41, FC22), provided the PROFIBUS telegram type — typically Standard Telegram 1 or 5 — is preserved in the restored parameter set.
Finally, for sites planning a longer-term migration from MASTERDRIVES MC to the SINAMICS S120 platform, the CU320-2 Control Unit combined with a compatible Motor Module Booksize offers a direct architectural upgrade path. The S120 retains PROFIBUS DP compatibility and supports the same HTL/TTL encoder interfaces, meaning existing motor cabling, encoder wiring, and fieldbus topology can be preserved during the transition — significantly reducing retrofit engineering hours and cabinet rework costs.
Q: Can I reuse existing motor and encoder wiring when replacing the 6SE7033-7EH84-1BH0?
A: Yes. The terminal layout and encoder interface of the replacement unit are compatible with the original wiring. No re-cabling is required for standard HTL/TTL encoder configurations. Verify shield grounding continuity before powering up.
Q: How do I migrate drive parameters from the old unit to the new one?
A: Use Siemens DriveMonitor or STARTER software to upload the full parameter set (P060 backup) from the original unit before removal. Restore the backup to the replacement unit, then perform a motor identification run (P115 = 1) to confirm motor data alignment.
Q: Will the replacement unit work with my existing PROFIBUS DP network without reconfiguration?
A: In most cases, yes. The PROFIBUS node address is stored in the CBP2 board, not the VCU itself. If the CBP2 is transferred to the new unit, the network address and GSD configuration remain unchanged. If a new CBP2 is installed, set the node address via DIP switch before connecting to the bus.
Q: Does the replacement unit fit in the same cabinet space?
A: The 6SE7033-7EH84-1BH0 uses a standard MASTERDRIVES chassis frame size H. The replacement unit maintains the same mechanical envelope, mounting hole pattern, and DC bus bar connection points. No cabinet modification or additional cooling adaptation is required.
Q: What is the recommended commissioning sequence after installation?
A: (1) Restore parameter backup. (2) Verify 24 VDC auxiliary supply. (3) Check DC bus pre-charge sequence. (4) Confirm PROFIBUS communication status (P722). (5) Run motor identification if motor data is uncertain. (6) Perform a no-load test run before connecting mechanical load.
Q: Is the unit compatible with Siemens S7-300/S7-400 PLC drive function blocks (FC/FB)?
A: Yes. The MASTERDRIVES MC series uses standardized PROFIBUS drive profiles (PROFIdrive). Existing S7 drive FBs communicate with the replacement unit without modification, provided the telegram type is preserved in the parameter set.
Every 6SE7033-7EH84-1BH0 unit dispatched by TOPNLMS is covered by a 12-month warranty from the date of delivery. Prior to shipment, each unit undergoes a structured pre-dispatch inspection that includes visual examination, power-on functional verification, communication interface check, and output voltage balance measurement. Units that do not pass all inspection criteria are quarantined and not offered for sale.
In the event of a warranty claim, TOPNLMS provides a replacement unit or full refund within the warranty period. Our after-sales response target is 24 hours for initial technical assessment and 72 hours for replacement dispatch on confirmed warranty cases. We maintain buffer stock of high-demand MASTERDRIVES MC components specifically to support rapid warranty fulfillment without extended lead times.
For procurement teams requiring documentation, we can provide inspection reports, test records, and shipment certificates upon request. All units are packed in anti-static, shock-absorbing packaging suitable for international air and sea freight. Export documentation including commercial invoice, packing list, and certificate of origin is prepared as standard for all cross-border orders.
Contact our technical sales team to confirm stock availability, request a compatibility assessment, or initiate a purchase order.
Contact: [email protected] | +86 18359293191
Website: https://topnlms.com
© 2026 TOPNLMS. All rights reserved. Original Source: https://topnlms.com
Click Quote This Model and the Part Number field will auto-fill with 6SE7033-7EH84-1BH0.