Mitsubishi FX1N-24MT-001 Replacement for MELSEC FX1N
FX1N-24MT-001FX1N-24MT-001 replacement & upgrade solution for MELSEC FX1N series. Full compatibility, 12-month warranty. Fast global shipping from TOPNLMS.
Request availability, condition, lead time and export shipping details for A3NCPUR21.
Send this exact part number, quantity and destination country. TOPNLMS will confirm availability, condition and export lead time before quotation.
The Mitsubishi Electric A3NCPUR21 is a high-performance CPU module designed for the MELSEC-A Series programmable logic controller platform. As industrial facilities worldwide accelerate the retirement of aging control architectures, the A3NCPUR21 has become a critical component in both direct replacement projects and structured migration programs. Whether your plant is running a legacy A2NCPUR21, A3NCPUR, or an earlier A-series CPU that has reached end-of-life, the A3NCPUR21 offers a proven upgrade path that preserves existing wiring infrastructure, rack mounting arrangements, and GX Developer or GX Works2 program logic with minimal re-engineering effort.
For facilities operating MELSEC-A Series control cabinets built around the A38B or A35B base units, the A3NCPUR21 slots directly into the CPU position without requiring mechanical modification. The module retains compatibility with the standard A-series I/O bus, allowing existing AX40 digital input modules, AY40 digital output modules, and AD61 high-speed counter modules to remain in service. This dramatically reduces the scope of a replacement project, limiting downtime to the CPU swap and program verification cycle rather than a full cabinet rebuild.
Communication continuity is one of the most critical concerns during any PLC migration. The A3NCPUR21 supports the MELSEC protocol (MC Protocol) over RS-232C and RS-422 interfaces, ensuring that existing SCADA systems, HMI panels such as the Mitsubishi GOT1000 or GOT2000 series, and upstream MES connections can continue to communicate without driver changes or protocol gateway additions. For sites that have already deployed AJ65BT-G4 CC-Link master modules or A1SJ71QBR11 MELSECNET/B remote I/O links, the A3NCPUR21 integrates directly into these network topologies, preserving remote station addressing and scan cycle timing.
Power supply compatibility is another key advantage. The A3NCPUR21 operates within the standard MELSEC-A power budget supplied by modules such as the A61P or A62P power supply units. Facilities that have already upgraded their power supply to the A68P or A65P will find the A3NCPUR21 equally compatible, with no derating required under normal operating conditions. This means the power distribution wiring within the control cabinet — including 24 VDC field supply rails and AC input terminations — can remain untouched during the CPU replacement.
For engineers managing a phased migration from a legacy A2A or A3A series system toward a Q-series or iQ-R platform, the A3NCPUR21 serves as an effective interim solution. It allows production to continue on the existing MELSEC-A architecture while migration planning, program conversion using GX Works2, and new cabinet fabrication proceed in parallel. When the final cutover to a Q06UDEHCPU or R04CPU is executed, the A3NCPUR21 can be retained as a tested spare or redeployed to a secondary line, maximizing asset utilization.
Installation of the A3NCPUR21 follows the standard MELSEC-A mechanical specification: the module is secured to the base unit using the integrated locking lever, and the battery connector for the A6BAT or Q6BAT backup battery is reconnected to preserve program and data retention. Firmware and program transfer is performed via the RS-232C programming port using GX Developer or GX Works2, with no special loader hardware required beyond a standard SC-09 or USB-SC09-A programming cable. For sites with existing Ethernet connectivity, an A1SJ71E71-B2 Ethernet interface module can be used alongside the A3NCPUR21 to enable remote monitoring without modifying the CPU itself.
From a procurement standpoint, sourcing a verified A3NCPUR21 replacement is often the fastest path to restoring production after an unplanned CPU failure. TOPNLMS maintains stock of the A3NCPUR21 and conducts pre-shipment functional testing on every unit, including program read/write verification, I/O bus communication checks, and battery circuit continuity. Each module ships with a 12-month warranty covering manufacturing defects and functional failures under normal operating conditions. Express shipping from our Xiamen warehouse is available for urgent replacement orders, with DHL and FedEx options supporting next-business-day delivery to most major industrial regions in Asia, Europe, and North America.
| Parameter | Legacy Model (A2NCPUR21 / A3NCPUR) | A3NCPUR21 (This Unit) |
|---|---|---|
| Series | MELSEC-A (AnN / AnA) | MELSEC-A (AnN) |
| Base Unit Compatibility | A35B, A38B, A38HB | A35B, A38B, A38HB |
| Program Memory | Up to 14K steps (A2NCPUR21) | Up to 30K steps |
| I/O Points | Up to 256 points | Up to 512 points |
| Communication Interface | RS-232C / RS-422 | RS-232C / RS-422 |
| Programming Software | GPPA / GX Developer | GX Developer / GX Works2 |
| Programming Cable | SC-09 | SC-09 / USB-SC09-A |
| Power Supply Compatibility | A61P, A62P, A65P, A68P | A61P, A62P, A65P, A68P |
| Battery | A6BAT | A6BAT / Q6BAT |
| CC-Link / MELSECNET Support | Via dedicated comm. module | Via AJ65BT-G4 / A1SJ71QBR11 |
| Physical Dimensions | Standard A-series slot width | Standard A-series slot width |
| Replacement Recommendation | Direct drop-in for AnN CPU slot | ✔ Confirmed compatible |
| Warranty | — | 12 Months (TOPNLMS) |
A complete MELSEC-A system migration or CPU replacement typically involves more than the CPU module alone. During the upgrade process, engineers commonly address the condition of the A38B main base unit and any A35B extension bases, verifying that backplane connectors are free of corrosion and that the bus termination resistors are intact. The A61P power supply module should be inspected and replaced if capacitor aging is suspected, as power supply degradation is a leading cause of intermittent CPU faults in aging MELSEC-A cabinets.
On the I/O side, the A3NCPUR21 works alongside existing AX40 DC input modules and AY40 transistor output modules without any address remapping, provided the I/O assignment in the CPU parameters matches the physical slot layout. For analog signal handling, the AD61 high-speed counter module and DA58 analog output module remain fully supported. Communication continuity is maintained through the A1SJ71E71-B2 Ethernet module for SCADA connectivity and the AJ65BT-G4 CC-Link master module for remote I/O expansion. HMI panels connected via RS-232C or Ethernet — including the Mitsubishi GOT1000 GT1575 series — require no driver updates when the A3NCPUR21 replaces an equivalent AnN CPU, as the MC Protocol command set is preserved.
For signal isolation between field devices and the PLC I/O bus, signal isolators and terminal block assemblies mounted on DIN rail within the same control cabinet can remain in place, further reducing rewiring scope and commissioning time.
Q: Can I reuse existing field wiring when replacing the CPU with an A3NCPUR21?
A: Yes. The A3NCPUR21 does not change the I/O module wiring. All field wiring connected to AX, AY, AD, and DA series I/O modules remains unchanged. Only the CPU slot is affected.
Q: Do I need to rewrite my ladder program for the A3NCPUR21?
A: In most cases, no. Programs written for A2NCPUR21 or A3NCPUR CPUs can be read back using GX Developer and written directly to the A3NCPUR21. Verify instruction compatibility using the GX Developer instruction list for the AnN series before transfer.
Q: Is the A3NCPUR21 compatible with CC-Link remote I/O networks?
A: Yes, when used with an AJ65BT-G4 or compatible CC-Link master module installed in the same base unit. The A3NCPUR21 itself does not include a built-in CC-Link interface; the dedicated communication module handles the CC-Link master function.
Q: Will the A3NCPUR21 fit in the same physical slot as my current CPU?
A: Yes. The A3NCPUR21 occupies a standard AnN CPU slot in A35B and A38B base units. No mechanical modification to the cabinet or base unit is required.
Q: What programming cable is required?
A: The SC-09 RS-232C programming cable is the standard option. The USB-SC09-A USB adapter is also compatible for use with modern laptops that lack a native RS-232C port.
Q: How long does commissioning typically take after a CPU swap?
A: For a direct replacement with an existing verified program backup, commissioning typically takes 2–4 hours, including program transfer, I/O check, and communication verification with connected HMI and SCADA systems.
Every A3NCPUR21 unit supplied by TOPNLMS is covered by a 12-month warranty from the date of shipment. Prior to dispatch, each module undergoes a structured pre-shipment test protocol that includes power-on verification, program read/write cycle testing via GX Developer, I/O bus communication confirmation, and battery circuit continuity check. Units that do not pass all test criteria are quarantined and not shipped.
In the event of a warranty claim, TOPNLMS provides a replacement unit or full refund based on the nature of the fault and the customer’s preference. Our after-sales response target is within 24 hours of claim submission for all industrial customers. Replacement units for warranty claims are dispatched with priority shipping at no additional cost to the customer.
For urgent unplanned replacement orders, express DHL or FedEx shipment from our Xiamen warehouse is available, with estimated transit times of 3–5 business days to most destinations in Asia, Europe, and North America. Bulk procurement and consignment stock arrangements are available for MRO customers and system integrators managing multi-site MELSEC-A fleets.
For procurement inquiries, technical compatibility questions, or warranty support, contact our industrial automation team directly.
Click Quote This Model and the Part Number field will auto-fill with A3NCPUR21.