LAUER PCS095.5 Original Industrial Spare PCS Series Compatible
PCS095.5Buy LAUER PCS095.5 original PCS Series HMI operator panel. Direct industrial replacement, full SKU compatibility, 12-month warranty. Ships tested from TOPNLMS.
Request availability, condition, lead time and export shipping details for PCS 695.
Send this exact part number, quantity and destination country. TOPNLMS will confirm availability, condition and export lead time before quotation.
When a LAUER PCS 695 HMI operator panel reaches end-of-life or fails unexpectedly on the production floor, every hour of unplanned downtime translates directly into lost output and escalating maintenance costs. The PCS 695 has served reliably across a wide range of machine-builder and OEM applications — from packaging lines and injection-moulding cells to conveyor control cabinets and process skids — but sourcing a direct replacement for a discontinued or aging unit demands both speed and technical precision. TOPNLMS supplies verified LAUER PCS 695 units and compatible upgrade paths specifically engineered to restore your system to full operation with minimal re-engineering effort.
The PCS 695 belongs to LAUER’s PCS Series of compact operator panels, sharing a common hardware platform with related models such as the PCS 090, PCS 095, PCS 950, PCS 9100, and PCS 9150. This family-level compatibility is a critical advantage during a retrofit: the panel cutout dimensions, mounting depth, and rear-connector pinout are consistent across the series, meaning a PCS 695 can often be installed into an existing control-cabinet aperture without sheet-metal modification. The 24 V DC supply input is standard across the PCS range, so existing power wiring from a SITOP PSU100S or equivalent DIN-rail power supply can be reused without rewiring the cabinet.
Communication is a central concern in any HMI migration. The PCS 695 supports serial interfaces including RS-232 and RS-485, and is compatible with LAUER’s proprietary PCS protocol as well as third-party driver libraries that bridge to Siemens S5 and S7 PLCs, Mitsubishi MELSEC controllers, and Modbus RTU networks. If your existing program was developed in LAUER’s PCS-Designer or an earlier PCS-Tool environment, the project file can typically be recompiled and downloaded to a replacement PCS 695 unit via the standard programming cable — no screen-by-screen recreation required. For sites migrating from an older PCS 090 or PCS 095 to the PCS 695, the expanded display resolution and additional function keys reduce the need for screen-navigation workarounds that were common on smaller-format predecessors.
Physical installation follows the same DIN-rail or panel-mount approach used throughout the PCS Series. The terminal block connector at the rear of the unit accepts the same wire gauges and ferrule types as earlier PCS models, and the protective IP65 front-face rating is maintained, making the PCS 695 suitable for direct replacement in wash-down or dusty environments without additional enclosure modification. Where the original installation used a LAUER PCS cable set for PLC connection, the same cable assembly is reusable with the replacement unit.
| Parameter | Legacy / Outgoing Model | LAUER PCS 695 (Replacement) |
|---|---|---|
| Series | LAUER PCS Series (PCS 090 / PCS 095 / PCS 950) | LAUER PCS Series |
| Supply Voltage | 24 V DC | 24 V DC (direct reuse) |
| Panel Cutout | PCS Series standard cutout | Same cutout — no sheet-metal work |
| Communication | RS-232 / RS-485, PCS protocol, Modbus RTU | RS-232 / RS-485, PCS protocol, Modbus RTU |
| PLC Compatibility | Siemens S5/S7, Mitsubishi MELSEC, Modbus | Siemens S5/S7, Mitsubishi MELSEC, Modbus |
| Programming Tool | PCS-Designer / PCS-Tool | PCS-Designer / PCS-Tool (project reuse) |
| Front Protection | IP65 | IP65 |
| Mounting | Panel mount / DIN rail | Panel mount / DIN rail |
| Rear Connector | PCS Series terminal block | Compatible — existing cable reusable |
| Warranty | — | 12-Month Warranty (TOPNLMS) |
A successful PCS 695 retrofit rarely involves the HMI panel alone. In practice, the migration touches several adjacent components within the same control cabinet or machine architecture. The programming cable used to download PCS-Designer projects to the panel must be confirmed compatible with the replacement unit — LAUER’s standard PCS programming cable (DB9 to RJ-style) is the correct interface and should be verified before commissioning. Where the host controller is a Siemens S7-300 or S7-400 series PLC, the existing CP 341 or CP 340 communication processor module handles the serial link to the PCS 695 without firmware changes, preserving the established data-exchange structure.
On sites running Mitsubishi MELSEC Q-series or FX-series controllers, the RS-485 port on the PCS 695 connects directly to the built-in RS-485 port of FX3U or FX5U CPUs, or through a Mitsubishi QJ71C24N serial communication module on Q-series racks. Signal integrity over longer cable runs between the PLC rack and the operator panel can be maintained using a DIN-rail-mounted signal isolator or RS-485 repeater, which is particularly relevant in electrically noisy environments such as variable-frequency drive (VFD) cabinets where Siemens MICROMASTER 440 or ABB ACS550 drives introduce common-mode interference on the bus.
Power distribution within the cabinet should be reviewed during the retrofit. A 24 V DC SITOP PSU100S or Phoenix Contact QUINT power supply with adequate current headroom for both the PCS 695 and any connected I/O modules is recommended. Where the original installation used a LAUER PCS 950 or PCS 9100 as the primary operator interface on a larger machine with distributed I/O, the PCS 695 can serve as a local satellite panel connected via RS-485 multi-drop, reducing the scope of the upgrade to a single node replacement rather than a full system overhaul.
Q: Can I reuse my existing wiring harness?
A: In most cases, yes. The PCS 695 uses the same rear-connector pinout as other PCS Series panels. Verify the cable assembly against the PCS 695 wiring diagram before powering up.
Q: Do I need to rewrite my HMI program?
A: No. Projects created in PCS-Designer or PCS-Tool can be recompiled and downloaded directly to the PCS 695. Minor screen-layout adjustments may be needed if migrating from a smaller-display predecessor such as the PCS 090.
Q: Is the communication protocol compatible with my existing PLC?
A: The PCS 695 supports the same PCS protocol, Modbus RTU, and serial driver set as the broader PCS Series. Siemens S5/S7 and Mitsubishi MELSEC drivers are supported without protocol conversion hardware.
Q: Will the panel fit the existing cabinet cutout?
A: The PCS Series shares a standardised cutout dimension. In most installations, the PCS 695 is a direct mechanical fit. Confirm the cutout size against the PCS 695 datasheet before ordering if your cabinet was originally fitted with a non-standard variant.
Q: How long does commissioning take on-site?
A: For a like-for-like replacement with an existing PCS-Designer project, commissioning typically takes two to four hours including program download, communication parameter verification, and functional testing of all screen pages and PLC data links.
Every LAUER PCS 695 unit shipped by TOPNLMS is covered by a 12-month warranty from the date of delivery. Prior to dispatch, each unit undergoes a pre-shipment functional test covering power-on self-test, display integrity, keypad response, and communication port continuity. Units that do not pass the full test sequence are not shipped.
In the event of a warranty claim, TOPNLMS provides a replacement unit or full refund within the warranty period. Our after-sales response target is one business day for initial fault assessment. Replacement units are dispatched from our Xiamen warehouse via DHL Express or equivalent tracked international courier, with typical transit times of three to seven business days to most industrial regions in Europe, Southeast Asia, and the Americas.
For procurement teams requiring documentation, we can provide a test report, packing list, and commercial invoice with HS code declaration for customs clearance. Bulk orders and standing purchase agreements are supported with lead-time commitments and reserved stock allocation on request.
Contact our technical sales team to confirm compatibility with your specific installation before placing your order.
Click Quote This Model and the Part Number field will auto-fill with PCS 695.