Allen-Bradley 1336-MOD-KB010 Ruggedized Dynamic Brake Module
1336-MOD-KB010Allen-Bradley 1336-MOD-KB010 ruggedized dynamic brake module for 1336 PLUS AC drives. Tested, in-stock, 12-month warranty. Fast global shipping from TOPNLMS.
Request availability, condition, lead time and export shipping details for 22B-D2P3N104.
Send this exact part number, quantity and destination country. TOPNLMS will confirm availability, condition and export lead time before quotation.
The Allen-Bradley 22B-D2P3N104 is a 2.3A / 0.75 kW (1 HP) 480V AC three-phase PowerFlex 40P Variable Frequency Drive, designed for compact panel installations where precise motor speed control and embedded DeviceNet communication are critical. As legacy PowerFlex 40 and PowerFlex 40P drives reach end-of-life or become increasingly difficult to source, facilities engineers and procurement teams are actively seeking verified replacement and upgrade paths that minimize engineering rework, preserve existing wiring infrastructure, and reduce unplanned downtime.
TOPNLMS maintains ready stock of the 22B-D2P3N104 and its compatible upgrade equivalents, fully tested and shipped with a 12-month warranty. Whether you are executing a like-for-like swap on a failed unit or planning a phased modernization of your motor control center, this guide covers everything you need to make an informed procurement decision.
| Parameter | Original: 22B-D2P3N104 | Replacement / Upgrade Path |
|---|---|---|
| Series | PowerFlex 40P | PowerFlex 40P (same series) / PowerFlex 523 (upgrade) |
| Output Current | 2.3 A | 2.3 A (matched) / 3.0 A (PowerFlex 523 next tier) |
| Power Rating | 0.75 kW / 1 HP | 0.75 kW matched; 1.1 kW available for derating margin |
| Input Voltage | 480V AC 3-Phase | 480V AC 3-Phase — direct wiring compatibility |
| Communication Protocol | DeviceNet (embedded) | DeviceNet retained; EtherNet/IP available via 25-COMM-E2P adapter on PowerFlex 523 |
| Control I/O | 6 DI, 2 DO, 1 AO, 2 AI | Compatible I/O mapping; terminal block layout preserved on same-series swap |
| Mounting / Enclosure | IP20 / NEMA Type 1, DIN rail or panel | Same footprint on 40P replacement; PowerFlex 523 requires minor bracket adaptation |
| Programming Tool | DriveExplorer / RSLogix 5000 | Studio 5000 / Connected Components Workbench (CCW) for 523 series |
| Parameter Migration | Manual re-entry or DriveExplorer export | CCW parameter import supported for PowerFlex 523 upgrade path |
| Warranty | — | 12-Month Warranty from TOPNLMS shipment date |
A successful 22B-D2P3N104 replacement rarely involves the drive alone. In most retrofit scenarios, the surrounding control architecture requires coordinated component sourcing to ensure the upgraded drive integrates cleanly into the existing panel and network topology.
For installations where the drive communicates over a DeviceNet network managed by a CompactLogix L32E or MicroLogix 1100 controller, the 1769-SDN DeviceNet Scanner module must be verified for firmware compatibility with the replacement drive’s node address and EDS file. If the site is migrating toward EtherNet/IP as part of a broader network modernization, the 25-COMM-E2P EtherNet/IP adapter can be fitted to a PowerFlex 523 to eliminate the DeviceNet segment entirely, simplifying the network topology and reducing scan time latency.
Panel wiring typically connects the 22B-D2P3N104 through a 1492-CABLE series pre-wired terminal block assembly. These assemblies are pinned to the drive’s control terminal layout and should be inspected before reuse on a replacement unit — terminal block pitch and signal assignments are consistent across the PowerFlex 40P family, so existing cable assemblies are generally reusable without modification. For installations using a 1606-XLP power supply to feed the 24V DC control circuit, no changes to the auxiliary power rail are required.
If the retrofit scope extends to the HMI layer, a PanelView Plus 7 Standard terminal already configured for the PowerFlex 40P via FactoryTalk View ME will require a faceplates update if the drive is upgraded to a PowerFlex 523, as the Add-On Profile (AOP) differs between the two series. Sites retaining the 22B-D2P3N104 on a like-for-like basis can reuse existing FactoryTalk View ME applications without modification.
For multi-drive installations in a common DC bus configuration or shared motor control center (MCC), the 22B-D2P3N104 may be paired with a 22-RFI-xx EMC filter module and a 22-SCF-xx dynamic braking resistor. Both accessories are compatible with the PowerFlex 40P replacement and should be retained to preserve CE/UL compliance and braking performance. If the MCC also houses a 1756-L71 ControlLogix processor managing the broader process loop, the drive’s DeviceNet node can be re-commissioned without changes to the ladder logic, provided the replacement unit is configured with the same node address and baud rate.
Installations in food processing, HVAC, or water treatment applications frequently require the drive to interface with a 1769-IF4 analog input module for process variable feedback. The 22B-D2P3N104’s analog input terminals accept 0–10V or 4–20mA signals, and this wiring is directly transferable to a replacement unit. No signal conditioning or re-ranging is required at the 1769-IF4 module level.
Q: Can I reuse existing motor and line-side wiring?
Yes. The 22B-D2P3N104 uses standard R/S/T line terminals and U/V/W motor terminals. A like-for-like replacement retains the same terminal designations and torque specifications. Verify wire gauge against the replacement unit’s terminal rating before re-terminating.
Q: Do I need to re-program the replacement drive?
For a same-series swap, parameter values from the failed unit can be re-entered manually or restored from a DriveExplorer backup file if one was captured during commissioning. TOPNLMS recommends requesting a parameter backup from site records before the original unit fails completely. For a PowerFlex 523 upgrade, parameters must be remapped using Connected Components Workbench (CCW), as parameter numbering differs between the two series.
Q: Is the DeviceNet node address preserved after replacement?
The DeviceNet node address is stored in the drive’s non-volatile memory and is lost when the unit is replaced. The replacement drive must be configured with the same node address (MAC ID) and baud rate as the original before connecting to the DeviceNet segment. This can be done via the drive’s integral keypad or through RSNetWorx for DeviceNet prior to energizing the network connection.
Q: Will the replacement drive fit in the existing panel cutout?
The PowerFlex 40P frame size for the 22B-D2P3N104 is Frame A. All Frame A units share the same mounting hole pattern and overall dimensions, so a replacement unit will fit the existing panel cutout and DIN rail position without modification. If upgrading to a PowerFlex 523, verify the frame size against the panel drawing, as the 523 series uses a different dimensional standard.
Q: What is the lead time and shipping arrangement?
TOPNLMS ships from Xiamen, China. In-stock units are dispatched within 1–2 business days of order confirmation. International shipments are routed via DHL Express, FedEx International Priority, or UPS Worldwide Expedited depending on destination and urgency. Export documentation including commercial invoice, packing list, and certificate of origin is provided with every shipment.
Q: How do I verify authenticity before installation?
Every unit shipped by TOPNLMS undergoes pre-shipment functional testing including power-on verification, parameter read/write check, and output voltage measurement. A test report is available upon request. Units are supplied in original or equivalent protective packaging with visible catalog label and date code.
All Allen-Bradley 22B-D2P3N104 units supplied by TOPNLMS are covered by a 12-month warranty from the date of shipment. This warranty covers defects in materials and workmanship under normal operating conditions. Units that fail within the warranty period are eligible for replacement or repair at no additional cost to the buyer, subject to inspection and confirmation that the failure is not attributable to installation error, overvoltage, or physical damage.
Pre-shipment testing is conducted on every unit and includes: power-on self-test, control terminal I/O verification, communication port check, and output phase balance measurement. Test records are retained and available upon request for quality audit purposes.
TOPNLMS provides post-sale technical support via email and phone to assist with installation, commissioning, and parameter configuration questions. Response time for technical inquiries is within one business day. For urgent field issues, priority support is available by contacting our sales team directly.
Procurement teams requiring documentation for vendor qualification, incoming inspection, or ERP system entry can request a Certificate of Conformance, packing list, and commercial invoice in advance of shipment. Letter of Credit (L/C) and Telegraphic Transfer (T/T) payment terms are accepted for qualified buyers.
© 2026 TOPNLMS. All rights reserved.
Original Source: https://topnlms.com
Contact: [email protected] | +86 18359293191
Click Quote This Model and the Part Number field will auto-fill with 22B-D2P3N104.