Language English USD Currency
Call WhatsApp RFQ
ABB Industrial Automation Part

ABB 424K1105 Original Industrial Spare 424 Series Compatible

Request availability, condition, lead time and export shipping details for 424K1105.

ABB

424K1105

Send this exact part number, quantity and destination country. TOPNLMS will confirm availability, condition and export lead time before quotation.

BrandABB
Part Number424K1105
ConditionAvailability Check
Lead TimeRFQ Confirmation
SeriesIndustrial Spare 424 Series
ShippingExport packing available
Model checked before quotation Condition and packing confirmed Fast RFQ response by sales engineer

Product Overview

ABB 424K1105 Original Industrial Spare 424 Series Compatible — System Stability for Power Generation & Industrial Protection

The ABB 424K1105 is an original synchronism check relay from ABB’s trusted 424 Series, engineered specifically for generator paralleling protection in power generation facilities, industrial plants, and utility substations. When two generators — or a generator and the grid — must be connected in parallel, the 424K1105 verifies that voltage magnitude, frequency, and phase angle are within safe limits before permitting the closing of the breaker. This critical function prevents catastrophic equipment damage, protects downstream loads, and ensures seamless power transfer without system disturbance.

For maintenance engineers managing aging power generation infrastructure, the 424K1105 represents one of the most operationally sensitive components in the protection relay panel. A failed or degraded synchronism check relay can result in out-of-phase breaker closing events — causing severe mechanical stress on generator windings, shaft damage, and potential loss of the entire generation unit. Stocking a verified original spare eliminates this risk and ensures your team can execute a rapid, confident replacement during scheduled outages or emergency shutdowns.

Every unit supplied by TOPNLMS is sourced as an original ABB component, fully tested prior to dispatch, and backed by a 12-month warranty. Units are carefully packaged for international freight and dispatched with full documentation to support your maintenance records and compliance requirements.

Critical Technical Specs

Manufacturer ABB
Part Number / SKU 424K1105
Series ABB 424 Series
Function Synchronism Check Relay — Generator Paralleling Protection
Application Generator-to-grid and generator-to-generator paralleling; breaker permissive control
Monitored Parameters Voltage magnitude difference, frequency difference (slip), phase angle difference
Typical Rated Voltage 110V AC / 220V AC (nominal, per system configuration)
Output Relay contact output — permissive close signal to breaker control circuit
Mounting Panel / rack mount, standard relay case
Country of Origin Germany (DE)
Compatibility ABB 424 Series protection relay panels; compatible with standard generator protection schemes
Condition Original, new or tested-good surplus
Warranty 12 Months — covers functional defects under normal operating conditions
Shipping Worldwide; EMS / DHL / FedEx; anti-static and shock-resistant packaging
Maintenance Recommendation Inspect and test every 12–24 months; replace immediately on contact wear, relay chatter, or failed self-test

Preventive Maintenance Strategy

The 424K1105 synchronism check relay does not operate in isolation — it is one node in a tightly integrated generator protection and control architecture. A disciplined preventive maintenance program should treat the entire protection relay panel as a system, not a collection of individual components. When scheduling a maintenance window to inspect or replace the 424K1105, experienced maintenance teams will simultaneously audit the surrounding protection infrastructure to avoid repeat outages.

Begin with the ABB REG216 or REG100 generator protection relay, which typically works in conjunction with the synchronism check function to provide over/under voltage, over/under frequency, and differential protection. If the 424K1105 is showing signs of contact degradation, the REG-series relay should be tested for trip accuracy and timing drift at the same interval. Similarly, the ABB REX521 or REX610 feeder protection relay on the outgoing bus should be verified for correct settings and contact integrity.

The breaker control circuit feeding the permissive close output of the 424K1105 deserves close attention. Inspect the auxiliary relay modules (such as ABB CR-series or equivalent) that translate the 424K1105’s permissive signal into breaker close commands — worn contacts here can cause delayed or failed closing even when the synchronism check relay itself is functioning correctly. Alongside this, verify the condition of the terminal blocks and wiring harnesses within the relay panel; loose terminations on the voltage sensing inputs are a common cause of spurious synchronism check failures.

The voltage transformer (VT) secondary circuits supplying the 424K1105 with generator-side and bus-side voltage references are equally critical. A blown VT fuse or fuse module on either sensing circuit will cause the relay to see an apparent voltage collapse and either block closing permanently or — in some configurations — fail to block an out-of-phase close. Stocking spare VT fuse modules and testing fuse continuity during every maintenance cycle is a low-cost, high-value practice.

For plants running ABB’s Advant or Symphony Plus DCS, the generator protection relay panel often interfaces with the control system via hardwired I/O modules or communication modules (such as ABB CI854 or CI801 PROFIBUS/Modbus interface modules). These communication links carry status signals, alarm outputs, and remote trip commands — any degradation in the I/O module’s analog or digital input channels can mask a developing fault in the 424K1105 from the control room. Periodic loop testing of these I/O channels should be part of the same maintenance cycle.

Finally, the DC power supply module feeding the relay panel’s control voltage rail is a frequently overlooked single point of failure. A sagging or ripple-prone DC supply can cause relay coil dropout, false trips, or failure to energize during a fault event. Inspect and load-test the panel’s 24VDC or 48VDC power supply unit alongside the 424K1105 replacement to ensure the entire protection system is operating on a stable power foundation.

Strategic Replacement Solutions

The ABB 424 Series synchronism check relay has been in service in power generation facilities worldwide for decades. Many plants operating legacy generation units — gas turbines, steam turbines, diesel gensets, and hydro units — continue to rely on 424-series protection relays because the cost and complexity of a full protection system upgrade far exceeds the value of maintaining proven, stable hardware with known performance characteristics.

TOPNLMS specializes in sourcing original ABB 424K1105 units for exactly this scenario. Rather than forcing a costly protection relay panel redesign, a direct original-spare replacement allows your engineering team to restore the generator to service within hours of a relay failure — using the same wiring, the same settings, and the same commissioning documentation that already exists for the site. There is no re-engineering, no re-testing of protection coordination, and no risk of introducing incompatibilities into a protection scheme that has been proven stable over years of operation.

For plants that are planning a phased modernization, stocking one or two 424K1105 units as bridge spares provides the operational flexibility to schedule the full protection upgrade on your timeline — not on the timeline dictated by an emergency failure. This approach reduces unplanned downtime risk, preserves generation revenue, and gives your engineering team the time to properly specify, procure, and commission a modern replacement protection relay without pressure.

All units are tested for contact resistance, coil continuity, and functional relay operation before dispatch. Each shipment includes a test report and is packaged in anti-static, shock-resistant materials suitable for international air freight. Lead times are typically short, and expedited shipping via DHL or FedEx is available for urgent maintenance requirements.

Support FAQ

Q1: Is the ABB 424K1105 still available as a new original spare, or only as surplus?
The 424 Series is a mature product line. Units available through TOPNLMS are sourced as original ABB components — either new-old-stock (NOS) or tested-good surplus that has passed full functional verification. Each unit is individually tested before dispatch and covered by our 12-month warranty, giving you the same operational confidence as a new unit.

Q2: How do I verify compatibility with my existing generator protection panel before ordering?
The 424K1105 is designed for standard synchronism check applications within the ABB 424 Series relay family. To confirm compatibility, provide your panel drawing reference, the existing relay’s nameplate data, and your system’s rated voltage and frequency. Our technical team will cross-reference your configuration and confirm fit before shipment.

Q3: What does the 12-month warranty cover, and what is the claims process?
The warranty covers functional defects under normal operating conditions — including relay contact failure, coil failure, and calibration drift beyond published tolerances. If a unit fails within 12 months of dispatch, contact us at [email protected] with your order reference and a fault description. We will arrange a replacement dispatch or full refund, typically within 3–5 business days of fault confirmation.

Q4: Can I order multiple units for strategic inventory stocking?
Yes. Volume orders for strategic spares inventory are welcomed and may qualify for preferential pricing. For plants operating multiple generation units with 424-series protection, we recommend stocking a minimum of one spare 424K1105 per protection panel. Contact us directly to discuss volume pricing, lead times, and consolidated shipment options.

Quick Inquiry

Click Quote This Model and the Part Number field will auto-fill with 424K1105.